Location
115 Southwest Cutoff
Worcester, MA 01613
In the fall of 2015, A.F. Amorello was awarded the road contract for the off-site work for the Shops at Highland Commons Project in Hudson/Berlin, MA. A.F. Amorello had previously completed the last phase of the site portion of this 1,000 sf retail mall in 2015. This off-site work was a one mile stretch of Route 62 that consisted of full depth reclamation, milling, drainage, retaining walls, traffic signals, paving and curbing. This road widening and realignment was part of the traffic mitigation for the mall and entrance/exists to route 495.
Posted on 10/01/2016 at 12:00 AM